Thirteen-year
experience as an OSP Construction Inspector and Engineering in relations to
Buried, Aerial or Boring in relations to
Fiber
Network. Received training and hands on all technical aspects of outside
plant construction. Additional training on
Radio
Detector PDL2 Underground Locator. Train in Underground Technologies,
Certified OSHA Standard Subpart P by National Utility Contractors Assasociation,
VTA, UPRR & Metro Link train an certified as a Fiber splicer.
Other OSP
consist
of Field Surveying, Field Engineering, , Grade monitoring (CPT), Cone
Penetration Test- density & voids station
to
station, Street construction Remove & Replace concrete sidewalks
asphalt roads highways.
.
Engineering Associates 2013
OSP Inspector for CenturyLink Qwest in Las Vegas, Construction Co. Fishel
Duties monitor
Fishel
Construction work progress production station to station boring and
trenching conduits. Draw asbuilts write up daily
reports
all aspects of OSP substructure.
Byers Engineering 2013
Inspector for CenturyLink Qwest Communications Northern and Southern
California. Duties monitor
Maintenance
crew VCI, in Valencia to San Diego Ca, drawing asbuilts filling out
fiber and daily reports. Work consist of
monitoring
manholes adjustments, newbuilts Qwest Pvc structure underground built and
fiber placement.
Linderlake Corporation 2010-2013
Dig ticket Locator for Level3 Communications. Work locations: Los
Angeles
To
San Bernardino, Ca to Barstow to Riverside, Ca to Sun City. Locator type
PDL2 Underground Locator.
Forkert Engineering & Surveying 2010 Inspector for At&t Project#7682836 San
Obispo, Ca to Los Angeles, Ca.
Duties:
Watch the money monitor constructions crews VCI Telcom, Inc. and HP
communications work progress daily performances. Perform Daily, Quantity
and Time & Material reports draw Asbuilts read asbuilts primarily
keeping
up
with data and making sure construction don’t go against the gain, unless it
necessary. Project consist of performing Bores,
trenching,
placing man holes, 11/4” ducts and 144 fiber count inside existing At&t
4” innerduct system. I work section 3 & 4
Los
Angeles to Saticoy, Ca.
Sunbelt Telecommunications. 2008-2010
OSP Engineer for Qwest Communications on varies project.
Project 1# CNN0226:
Caltrans Project Fiber relocate Owest & Verizon Telecommunications
location 5th & 23th St at 880
Hwy
Oakland, Ca. OSP Lead Engineer. 2008 Duties- Inspecting Construction
Company Manual Bros Inc. daily work performance removing &
replacing fiber optic cables & installation of manholes. Primary
watching the money maintaining security of Qwest & Verizon buried
live systems.
Project 2# CNN0116: 2008
Paseo Padre Bart Project Qwest & Verizon Telecommunications New Built
Relocate Conduits
fiber
optic cables 168, 72 & 144 fiber count substructure work, direct boring
trench in place and installations of manholes
and
handholes construction Company K-Com Construction work location Fremont,
Ca. OSP Lead Inspection/ Engineer
inspect
& monitor K-Com daily work progress read and draw asbuilts
perform redlining monitor the money.
Project 3# CNN0288:
2008-2009 Phase 1 VTA Bart Project Relocate New Built Substructure Joint
Trench systems 168,
144,
& 72 Fiber counts Qwest & Verizon. Others
At&t, Level 3, Sprint, Cinder Morgan & Chevron petroleum
companies.
Locations Warm Springs & Milpitas, Ca. Position: OSP Engineer, monitor
Construction Company JFCS
(J
Fletcher Cramer & Son.) daily work progress 20” BSP direct boring and
trench in place varies ducts and ducts
packages.
Removal & installation of manholes and handholes process read perform
asbuilts redlining drawings of new
built
relocations. As an asset, monitor Kinder Morgan & Chevron pipeline
work pre an post installation process
10”
20” BSP casing boring process Buried laterals and tie ins. Familiar
with the entire pipeline Installation process
related
to gas, petroleum and fiber systems.
Project 4# 82D4NLR: 2009
Qwest Project Substructure Relocate New Built 72 fiber count conduits and
manholes.
Locations:
San Jose and Santa Clara, Ca. Work performed by Henkles & McCoy
Construction. Position Lead OSP
Engineer,
inspect and monitor daily work progress Henkles & McCoy job
performance, watch the money in relations
to
materials used read draw asbuilts and redlining. Direct boring trench in
place conduits installations of manholes
and
mediate with the city of San Jose inspection department regarding changes.
Project 5# CNN0287::
2009-2010 Phase 2 VTA Bart Project Relocate New Built Substructure Joint
Trench systems 168,
144
& 72 Fiber count Qwest & Verizon. Others At&t, Level3, Sprint,
Kinder Morgan & Chevron petroleum Co. Locations Warm Springs &
Fremont, Ca. Position: OSP Engineer inspect & monitor construction Co.
(JFCS) J Fletcher Cramer &
Sons
daily work progress Installation direct bore 20” BSP casing installations
of manholes trench in place conduits and conduits joint packages.
Primarily, Maintaining security of Qwest Existing live fibers and new built
systems.
RJE Telecom of California, Inc. 2008 Field Engineering Aerial Inspector for AT&T Santa Rosa,
Ca.
Type
of work: Construction Maintenance (JP) Joint pole work. Aerial (PT) phone
telecommunication
Copper
Cable systems with joint partners, (PG&E) Pacific Gas & Electricity
& Comcast. PG&E perform
Maintenance
modification, removing old poles installing new poles. Mounting &
adjusting (HOA) Height
Of
Attachments of utilities according to (AJT) Authorization for joint pole
transaction form. My duties:
Field
engineer monitor work progress of (PG&E) by measuring attachments,
Cable TV & Telco utilities,
Anchors,
F Arms, Guard Arms, spans between poles & Leads & Guys. With
all this verify work on Final
Bill
Field Checklist, Cpolo2, Intent Response Field Checklist, Form 48 and
Authorization for joint pole
transaction
forms which I mention earlier. This work took place in Santa Rosa to San
Francisco, Ca and
surrounding
counties in between.
|